On March 19, 2026, the Dongying base of Shandong Yongli Jinggong Petroleum Equipment Co., Ltd. held the kick-off meeting for its strategic HR management consulting project in the group's conference hall. The chairman, the general manager and the management team, heads of departments and the three-member consulting team attended. The meeting marks the full launch of a systematic upgrade of the company's organizational capability, and a solid, critical step in Yongli Jinggong's transition from an opportunity-driven to a strategy-driven company.
Taking the initiative: putting organizational capability on a par with capacity building
Shandong Yongli Jinggong Petroleum Equipment Co., Ltd. manufactures precision components for oil equipment. Its main products are oil pipeline fittings (fittings, flanges, manifolds and valve parts), which it develops, produces and sells, mainly serving Sinopec, PetroChina and CNOOC — the "Big Three" — and the major oilfield service companies. Over the years, reliable product quality and dependable delivery have won the long-term trust of its customers and steady business growth.
As capacity expansion continues and the business becomes more complex, the company has put management upgrading on its own agenda: using system building to carry strategy through, and organizational effectiveness to support capacity release. At the meeting, the chairman said that customer orientation, a fighting spirit and the pursuit of quality are the "roots and soul" of Yongli Jinggong and must never be lost. At the same time, the company must see clearly that competition in the industry is shifting from single-point advantages to a contest of system capabilities. Only by continuing to improve organizational efficiency, the talent pipeline and management refinement can customer trust be turned into lasting competitiveness.
Systematic design: one core, two main lines, three stages
Running for about 12 months, the project takes "supporting the achievement of corporate strategic goals" as its core and "organizational capability upgrade + talent capability upgrade" as its two main lines. It advances in three stages — strategy clarification, organization transformation and mechanism implementation — and covers six modules:
Strategic goals and decoding — clarify the strategic direction, build a strategy map and goal system, and break annual targets down to departments and positions;
Organization design and position system — optimize the organization structure, clarify the boundaries of departmental responsibilities, complete position setting, headcount planning and job descriptions, and establish a unified yardstick of position value;
Talent review and pipeline building — carry out a talent review of all staff, establish succession plans for key positions and dual career tracks for management and technology, and improve the skilled-talent development system;
Compensation system design — build a compensation system linked to position value, individual capability and performance contribution, making distribution fairer and incentives more effective;
Performance management system — build an indicator system and a closed performance management loop from company to department to position, so that goals have handles and contributions are assessed on evidence;
Policies compilation and implementation coaching — form an executable management policy system, and transfer the methods through training and trial runs so the system can iterate and improve on its own.
The project does not aim at "producing a pile of documents". It stresses the complete loop of design, trial run, review and optimization, so that the results truly land and get used.
United from top to bottom: led by the top leader, joined by everyone
In his speech, the chairman pointed out that this change is not simply about redrawing the structure, adjusting positions or changing pay. Its essence is a systematic upgrade of organizational capability. "Let those who hear the gunfire make the decisions," so that the front line can respond quickly to customer needs; "let those who create value get the rewards they deserve," so that employees have a path to grow and are rewarded for their contribution.
On behalf of the management team, the general manager set out the requirements for implementation. The project is a "top-leader project", personally led by the company's principal leaders, and the head of each department is the first person responsible for its advancement in that department. All departments are required to give full cooperation, be realistic and take the trial runs seriously, so that the change proceeds smoothly, in order and with real results. The meeting also made clear that production and operations continue as normal during the project, and that standards for product quality, order delivery and customer service will not be lowered.
Facing the future: building the foundation of growth on systems
Through the project, the company expects three core outcomes: a complete, implementable strategic HR management system; a team of managers who command modern management tools and methods; and a talent pipeline that supports the three-year development strategy. These will move the company from experience-based management to system-based management, with smoother operations, a more sustainable supply of talent and a fairer distribution of value.
Taking this launch as a new starting point, Yongli Jinggong will keep strengthening its management base and raising organizational effectiveness, repaying customer trust with better products and more reliable delivery, and moving toward high-quality development with steadier steps.
Book a free diagnostic review — on-site interviews and floor walks, with a dedicated diagnosis report.