Equipment Management Program · TPM Equipment Management

TPM and kaizen-teian as twin drivers: OEE climbs steadily — improvement goes from "nobody proposes" to "everyone rushes to propose".

Equipment ManagementIndustry: ManufacturingEngagement: System Building + Proposal Mechanism
Project site photo 08
Background

Project Background

Capacity kept expanding while equipment grew ever less obedient: frequent breakdowns, reactive firefighting, perfunctory inspection records — nobody could even state the OEE baseline. Production and maintenance blamed each other, the front line was indifferent, and improvement proposals were essentially zero.

With TPM as the framework and the kaizen-teian mechanism as the lever, Lizheng started by mapping the equipment baseline, then built inspection standards and an OEE dashboard — and used proposal incentives to turn the front line from bystanders into participants in equipment management.

Project site photo
Challenges

Key Challenges

Frequent Downtime

Unplanned stoppages recur; production plans are repeatedly disrupted.

Reactive Repairs

Fix when broken, break again after fixing — spares and crews run ragged.

Inspection as Formality

Checklists signed and done; hidden failures unnoticed — or noticed and ignored.

No Proposals

Proposals sit at zero for years — front-line wisdom idles.

Solutions

Lizheng's Solution

Autonomous & Professional Maintenance

Operators' autonomous inspection and professional repair divide and cooperate — responsibility in place.

Standardized Inspection & Care

Tiered inspection and maintenance baselines — execution on the record.

OEE Dashboard

Equipment efficiency in data — loss structure at a glance.

Kaizen-Teian & Incentives

Proposal review, rewards and star-team contests give improvement a payoff.

Process

Implementation Path

Baseline Mapping

Full inventory of equipment status and losses; OEE baseline set.

Baselines Set

Inspection baselines and visual standards issued as a set.

Pilot Teams

Model teams go first — validating the mechanism and setting the benchmark.

Plant-Wide Rollout

Phased rollout with proposal incentives — a lasting mechanism.

Results

Project Outcomes

IDowntime Under Control

Unplanned downtime sharply down; production plans steadier.

IIInspection Landed

Inspection turns from signature into action; hidden failures handled in time.

IIIOEE Climbing Steadily

OEE improves month by month — improvement you can track in data.

IVProposals from Zero

Front-line proposals flow; equipment improvement enters a virtuous cycle.

Note: outcomes are stated per client acceptance; more details available on call.