Inner Mongolia Huadian New Energy · Lean Management Uplift

Starting from 6S and standard work: a safe, efficient and sustainable lean operations system for a power company.

Lean ManagementIndustry: Power / New EnergyEngagement: On-Site Coaching + System Building
Project site photo 03
Background

Project Background

New-energy stations are many, widespread and thinly staffed; equipment sits far from cities in complex environments, with near-zero tolerance for safety and stability lapses. The company had relied on experience-based management: rough shop-floor control, work standards varying by individual, maintenance by veterans' feel — quality rose and fell with personnel.

Lizheng's team moved into the stations. Guided by the "three reals" — the gemba, the actual object, the real facts — they started from 6S and visual management, then extended into standard work, equipment inspection and team building, erecting a replicable, sustainable lean operations system.

Project site photo
Challenges

Key Challenges

Rough Shop-Floor Management

Tools and materials in disorder, no visual control — floor condition survives on inspection sprints.

Inconsistent Work Standards

Same operation, different practice by different hands; quality and safety rest on personal habits.

Experience-Dependent Equipment

Perfunctory inspection, unknown equipment condition, reactive firefighting repairs.

Weak Team Building

Teams lack management handles; shift handovers are casual; nobody leads improvement.

Solutions

Lizheng's Solution

6S & Visual Management

Fixed-location management, visual standards and red-tag campaigns make problems obvious.

Standardized Work (SOP)

Standards built item by item for key operations — running, inspection and maintenance all follow rules.

Equipment TPM Inspection

Autonomous plus professional maintenance — equipment management turns from reactive to proactive.

Team Building & All-Staff Kaizen

Standardized team management; the kaizen-teian mechanism activates everyone.

Process

Implementation Path

Gemba Diagnosis

Walk the stations, see the floor, interview the front line — an issue list takes shape.

Standard Building

6S and work standards built by area and by trade.

Pilot Station

A benchmark station goes first — a visible model.

Full Rollout

Model experience distilled into manuals and copied to all stations.

Results

Project Outcomes

IA Transformed Floor

Placement and visuals in place — floor status can be seen, checked and compared anytime.

IIWork by the Book

Key operations fully standardized; safety and quality stability markedly up.

IIIEquipment Turns Proactive

Inspection system landed — hidden failures found and fixed early.

IVEveryone Improves

The proposal mechanism runs; the front line shifts from "made to improve" to "wanting to improve".

Note: outcomes are stated per client acceptance; more details available on call.